The Brief:

Client:

Russell Mineral Equipment


Project vision:

Our strategic supply chain partner with best-in-class Russell Mineral Equipment, means we are aligned in delivering their superior innovations in mill relining equipment globally to continue to drive reliability, safety, productivity and sustainability with a state of the art and transformational edge.


How we helped:

• Joint design to control distortion
• Submerged Arc welding
• Change of material grade to suit welding and machining and keeping the particular design consistent regardless of length
• Elimination of pre-machining enables a simple design and construct project consisting of design, fabricate, final machine, blast and paint.

Learn more about Russel Mineral Equipment:


 RME is the global leader in the design, manufacture and supply of grinding mill relining technologies and services.


Mill relining is the most specialised and important task in the maintenance of a mineral concentrator. Mill relining dictates shut down times, mill availability and utilisation, through-put, and therefore mine site profitability.


RME’s passion and mission has always been to minimise mill relining time and to increase relining crews’ safety. RME Mill Relining System technologies, used effectively, have quartered the time taken to line large minerals processing grinding mills. Looking forward, RME’s focus is to secure the potential of RME’s Mill Relining System performance for each and every one of our Customers, past, present and future.



Website | LinkedIn | Facebook


See other projects

10 Jan, 2022
Airlie Beach Sustainable Water Project
10 Jan, 2022
Phibion MudMaster
10 Jan, 2022
Toowoomba Second 
Range Crossing
Share by: